Conveyor belt project assignment (wbs)part 1

Must be able to use MS project

 

Conveyor Belt Project- Part 1

Project Description
The new computer-controlled conveyor belt is an exciting project that moves and positions items on the conveyor belt within < J millimeter. The project will produce a new system for future installations, and for replacement of those in the field, at a low cost. The computer-controlled conveyor belt has the potential to be a critical unit in 30 percent of the systems installed in factories. The new system is also easier to update with future technologies. The Project Priority Matrix for the Conveyor Belt Project (CBP) is:

 

 

time

scope

cost

constrain

X

   

enhance

 

X

 

accept

 

 

X

 

 *Table A2.9 has been developed for you to use in completing the project exercise

 

Assignment
action: Develop the WBS outline using Microsoft project.

Question:

Does this information (in the WBS) allow you to define any milestones of the project? Why or why not?  What are they?

 

 

TABLE A2.9 -Conveyor Belt Project; WBS

Hardware
Hardware specifications

Hardware design

Hardware documentation

Prototypes

Order circuit boards

 

Operating systems

Kernel specifications

Drivers

    Disk drivers

    Serial I/O drivers

Memory management

Operating system documentation

NetWork interface

 

Utilitites

Utilities specifications

Routine utilities

Complex utilities

Utilities documentation

Shell

 

System Integration

Architectural decisions

Integration first phase

System hard/software test

Project documentation

Integration acceptance testing

 